
Installing the VoIP Intercom
Intercom Setup
Operations Guide 930181B CyberData Corporation
11
2.2.5 Network Connectivity, and Data Rate
When you plug in the Ethernet cable or power supply:
● The square, green Link light above the Ethernet port indicates that the network connection has
been established (see Figure 2-9 and Figure 2-10). The Link light changes color to confirm the
auto-negotiated baud rate:
• This light is yellow at 10 Mbps.
• It is orange at 100 Mbps.
Figure 2-9. Network Connector Prior to Installation
Kommentare zu diesen Handbüchern